| Type of installation |
2 block boiler room |
| Year of installation |
2010-2011 |
| Type of CHP unit |
TCG 2020 V20 |
| No. of installed CHP unit | 2 + 2 |
| Configuration | built-in installation |
| Fuel used |
natural gas |
| Installed el. output | 4 x 2014 kW |
| Mode of operation |
in peak hours (8 hours per day) |
|
Reduction of CO2 Emissions |
21.320 t/year |
| Utilization of primary energy | heat and power generation |
| Utilization of generated electricity | supply into grid |
| Utilization of produced heat | through accumulation heat supply into Českolipského tepla |
| General supplier |
ČKD PRAHA DIZ, a.s. |
| Technical Support, CHP unit Maintenance | INECO, s.r.o. |
| Photogallery COGEN II and III >> |