Type of installation |
2 block boiler room |
Year of installation |
2010-2011 |
Type of CHP unit |
TCG 2020 V20 |
No. of installed CHP unit | 2 + 2 |
Configuration | built-in installation |
Fuel used |
natural gas |
Installed el. output | 4 x 2014 kW |
Mode of operation |
in peak hours (8 hours per day) |
Reduction of CO2 Emissions |
21.320 t/year |
Utilization of primary energy | heat and power generation |
Utilization of generated electricity | supply into grid |
Utilization of produced heat | through accumulation heat supply into Českolipského tepla |
General supplier |
ČKD PRAHA DIZ, a.s. |
Technical Support, CHP unit Maintenance | INECO, s.r.o. |
Photogallery COGEN II and III >> |